Bamboo
Bamboo integrates through a dedicated plugin rather than a script. The Testsigma Test Plan Run task triggers a test plan and waits for the result. It writes the JUnit report to the path set in the task form.
Prerequisites
- The plugin, from the Atlassian Marketplace.
Configure the plan
Section titled “Configure the plan”Install the plugin from Bamboo administration settings > Manage apps > Find new apps by searching for Testsigma Test Plan Runner, or upload it from the Marketplace listing.
-
Create a plan: from the Build Dashboard in your Bamboo instance, click Create > Create Plan on the top menu.
-
Configure it: enter a Project name and Plan name, configure your repository, and click Configure Plan.
-
Add the task: click the Add Task tab, search for Testsigma Test Plan Run, and select it.
-
Fill in the details:
- Task description: a name for the task.
- Testsigma API Key: generate one under Settings > API Keys.
- Testsigma Test Plan ID: from the test plan details page in Testsigma.
- Maximum wait time for Task completion: the maximum time in minutes the plugin waits before timing out.
- Report File Path: the file path where the JUnit report XML file is stored.
-
Save the plan: click Save to save the task details, then Save and Create to create the plan.
Try a sample build
Section titled “Try a sample build”Click Run Now to trigger the pipeline manually. When the pipeline reaches the Testsigma task, the test plan starts. Confirm it under Dashboard > Test Plans in Testsigma, and check the results there.
Was this page helpful?
Thanks for the feedback.